9 Fire Pump Inspection and Testing Requirements (NFPA 25 Chapter 8)

NFPA 25 Ch. 8NFPA 20

Short answer: under NFPA 25 Chapter 8, diesel fire pumps get a no-flow (churn) test every week for at least 30 minutes. Most electric fire pumps get a churn test monthly for at least 10 minutes, but some arrangements must still run weekly. Every fire pump also gets an annual flow test at churn, rated flow and peak flow. The pump room is inspected on a regular cycle in between. Frequencies here follow the 2023 edition; confirm the edition your jurisdiction enforces, because earlier editions differ (the monthly option for electric pumps first appeared in the 2011 edition).

For Gilbert commercial buildings: this guide applies to properties across Gilbert · Phoenix Southeast Valley · Maricopa County. Rapid commercial growth creates demand for addressable fire alarm installation. Enforcement is handled by Gilbert Fire Department.

Last updated: 2026-11-16 · Published by Fire Solutions NW · AZ ROC CR-11 Fire Protection Systems · Licensed in 8 states

1

Diesel pumps: weekly churn test, 30 minutes minimum

NFPA 25 §8.3.1.1

Diesel engine-driven fire pumps run in a no-flow condition every week for at least 30 minutes. The run time lets the engine reach operating temperature and drives moisture out of the crankcase. Engine readings (speed, oil pressure, coolant temperature) and suction and discharge pressures are recorded.

2

Electric pumps: monthly churn test, 10 minutes minimum

NFPA 25 §8.3.1.2

Most electric motor-driven fire pumps are tested monthly in a no-flow condition for at least 10 minutes. The test should start the pump automatically, as it would in a fire, rather than by pressing the run button.

3

Some electric pumps still need weekly tests

NFPA 25 §8.3.1.2

The monthly interval does not apply to every electric pump. The standard keeps weekly testing for specific arrangements, such as pumps serving high-rise buildings beyond the fire department’s pumping capability, vertical turbine pumps, pumps with limited-service controllers, and pumps taking suction from sources that do not provide enough pressure. Check the list in the edition your AHJ enforces before moving a pump to monthly.

4

Pump room conditions

NFPA 25 §8.2.2

The pump room or pump house is kept at not less than 40°F (4°C), or 70°F (21°C) for diesel pump rooms without engine heaters. Ventilating louvers must operate freely, and suction, discharge and bypass valves must be fully open.

5

What gets observed during the churn test

NFPA 25 §8.3.2

During the run the attendant records suction and discharge pressure, checks the packing glands for a slight drip (not a stream), listens for unusual noise or vibration, and confirms the circulation relief valve discharges water to keep the pump cool. Electric pumps also get voltage and current readings where provided.

6

Qualified attendance during tests

NFPA 25 §8.3.1

Qualified personnel must be in attendance while the pump runs for the weekly or monthly test, unless the edition in force allows an approved automated alternative. An unattended pump run that overheats is a common source of damage.

7

Annual flow test at three points

NFPA 25 §8.3.3

Once a year the pump is tested at no flow (churn), rated flow (100%) and peak flow (150% of rated capacity, or the maximum the supply allows). Results are compared with the original acceptance test and the manufacturer’s certified curve to find degradation before it matters.

8

Controller, transfer switch and power checks

NFPA 25 §8.3.3

The annual test also exercises the controller and, where provided, the automatic transfer switch and alternate power source under load. For diesel pumps, fuel level, batteries and the engine cooling system are inspected on their own schedules in Chapter 8.

9

Keep the records

NFPA 25 §4.3

Weekly or monthly test logs and the annual flow test report must be kept and available to the fire code official and your insurer. A pump in perfect condition with no test records is still cited.

Bottom line for Gilbert facility managers

A fire pump is often the single point of failure for the sprinkler and standpipe systems that depend on it. The weekly or monthly churn run is something a trained building engineer can observe and log; the annual three-point flow test and any repair belong to a qualified fire protection contractor. If you are not sure whether your electric pump qualifies for monthly testing, keep it on weekly until your contractor or AHJ confirms.

If you manage commercial property in Gilbert or nearby (Chandler, Mesa, Queen Creek), Fire Solutions NW can audit against this list and clear any findings before your next AHJ inspection.

Have a specific question about your Gilbert facility?

We serve commercial buildings across Gilbert · Phoenix Southeast Valley · Maricopa County. Call us directly — 28+ years in the trade, and we self-perform in AZ.